ENTSOG Annual Report 2013

System Operation

System Operation is primarily responsible for the development of technical network codes, as well as providing other working groups with technical input in the development of codes and tools that facilitate the exchange of gas across networks.

AREA STRUCTURE

SYSTEM OPERATION BUSINESS AREA

There are two working groups (WGs), the InterĀ­ operability Working Group (INT WG), responsible for technical aspects of cooperation between TSOs with respect to business rules, gas quality, odourisation and data exchange and the Trans- parency Working Group (TRA WG), responsible for the publication and reporting of technical information from ENTSOG pertaining to transĀ­ parency guidelines and REMIT.

General Manager

System Operation

Interoperability WG

Transparency WG

Image courtesy of Snam Rete Gas

ENTSOG Annual Report 2013 |

31

Made with