ENTSOG GRIP BEMIP 2014-2023 / Main Report

Table of Content

INTRODUCTION

3

EXECUTIVE SUMMARY

4

1 THE EU INITIATIVES ON ENERGY INFRASTRUCTURE 6 1.1 The Latest Changes in the EU Regulations and Procedures on Energy Sector . . . . . . . . . . . . . . 7 1.2 PCIs Status and Selection Process . . . . . . . . . . . . . 8

2 DESCRIPTION OF THE BEMIP REGION 10 2.1 Summary of the Latest Changes in the BEMIP Region . . . . . . 11 2.2 Finland . . . . . . . . . . . . . . . . . . . . . . . . 12 2.3 Estonia . . . . . . . . . . . . . . . . . . . . . . . . 20 2.4 Latvia . . . . . . . . . . . . . . . . . . . . . . . . 23 2.5 Lithuania . . . . . . . . . . . . . . . . . . . . . . . 30 2.6 Poland . . . . . . . . . . . . . . . . . . . . . . . . 34 2.7 Denmark . . . . . . . . . . . . . . . . . . . . . . . 40 2.8 Sweden . . . . . . . . . . . . . . . . . . . . . . . 45

3 BEMIP EXPERIENCE SO FAR 48 3.1 Analysis of Interoperability of Gas Infrastructure Projects . . . . . 49 3.2 Market Integration Process in the West Baltic Region . . . . . . . 60

4 INVESTMENT PROJECTS OF THE REGION 64 4.1 Map of Planned Infrastructure Projects . . . . . . . . . . . . 65 4.2 Analysis of non-FID Projects . . . . . . . . . . . . . . . . 67

CONCLUSIONS

76

ASSUMPTIONS

77

LEGAL DISCLAIMER

77

ABBREVIATIONS

78

2 |

Baltic Energy Market Interconnection Plan GRIP 2014–2023

Made with