ENTSOG GRIP BEMIP 2014-2023 / Main Report
F i n l a n d
Narva
DN 500
BALTIC CONNECTO
DN 350/400
D N 2 0 0
TALLINN
Paldiski
E S T O N I A GAS TRANSMISSIO SYSTEM
D N 5 0 0
Pärnu
Karksi
Pskov
55
102
Värska
G u l f o f R i g a
Misso
Izborsk
N O RD STREAM
91
DN 700
Korneti
DN 700
DN 700
R U S S I A
L AT V I A
Inčukalns UGS
RĪGA lecava
DN 700
DN 350
Rēzekne
DN 500
DN 500
Liepāja
DN 500
DN 500 56
DN 400
Kieménai
Daugavpils
Śiauliai
Klaipeda
Klaipeda
Visaginas
DN 400 Figure 2.15: Gas transmission network, Latvia
DN 500
Jurbarkas
DN 700
DN 700/350
Kaunas
Jauniunai
57
DN 700/500
Šakiai
Kotlovka
YA M A L
92
VILNIUS The first gas transmission pipeline to Latvia was built in 1962, followed by the two next pipelines in 1966 and 1967. In general, almost 25% of pipelines are older than 40 years.
Kaliningrad
MINSK
Year of putting into operation Length (km)
Conventional diameter (mm)
Operating pressure (bar)
Gas pipeline
Age (years)
B E L A R U S 500 25
GI P L
P O L A N D
Vilnius – Riga
1962
42.33
52
Tietierowka
Riga – Panevezys
1983
84.03
700
40
31
93
Iecava – Liepaja
1966
209.64
500 / 350
25
48
Pskov – Riga
1972
160.63
700
47
42
Izborsk – Inčukalns UGS
1984
162.51
700
47
30
Riga – Inčukalns UGS I
1967
41.75
700
40
47
Riga – Inčukalns UGS II
1978
41.74
700
40
36
Riga – Daugavpils
1988
203.00
500
25
26
Vireši – Tallinn
1994
88.00
700
45
20
Upmala – Preiļi – Rezekne
2001 / 2005
66.71
400 / 350
54
13 / 9
Branch lines
139.66
Total
1,240.00
Table 2.6: Description of the gas transmission system, Latvia
In order to assess conditions of pipelines already in 1999 JSC Giprospecgaz ana- lysed gas supply system in Latvia and elaborated the Action plan for gas supply system development till 2010 and concept till 2030, which was updated by the same company in 2008. The gas transmission network of Latvia was studied, and particular measures were proposed for increase of gas supply safety. Based on these studies program for inspection of pipelines and repair of discovered defects was elaborated. At present, 98% of the whole transmission network in Latvia is inspected and it is planned to finish inspection and repair of the defects discovered by the inspection by the end of 2014.
28 |
Baltic Energy Market Interconnection Plan GRIP 2014–2023