ENTSOG GRIP BEMIP 2014-2023 / Main Report
INFRASTRUCTURE / THIRD PARTY INFRASTRUCTURE
At the end of 2013, gas transmission system in Poland consisted of: high pressure gas pipelines with total length of 10,077km, 63 entry points, 966 exit points, 882 gas stations, 14 compressor stations and 57 system nodes. The gas network in Poland is connected to the European grid, but mainly along the East-West axis. There are six major entry points into the transmission network that are located at Drozdowicze (Ukraine), Wysokoje (Belarus), Lwówek and Włocławek (Belarus, on the Yamal-Europe pipeline), Lasów (Germany), Cieszyn (Czech Republic). Total capacity of all cross-border points amounts to approximately 210TWh / year. GAZ-SYSTEM S.A. has been taking steps to build new interconnection points and expand the ones that already exist. The company is currently constructing LNG terminal in Świnoujście (via its SPV, Polskie LNG) and more than 1,000km of new gas pipelines. The most important pipelines will be situated in north-western and central Poland. In addition, a physical reverse flow on the Yamal –Europe pipeline will be put into operation (virtual reverse is operational since November 2011). All of these investments will be completed in 2014. They will enable to foster Poland’s energy security through the creation of technical conditions to diversify the natural gas supply. These activities are also conducive to the further liberalisation of the gas market in Poland and enhancement of its competitiveness. In the mid-term (until 2018 and in the perspective of 2023), GAZ-SYSTEM S.A. plans to commission projects aimed at enhancing the transmission system in Poland and constructing new cross-border interconnections with the systems in Lithuania, Slovakia and the Czech Republic. Additionally, GAZ-SYSTEM S.A. plans to upgrade the LNG terminal in Świnoujście and realise the Baltic Pipe project.
Šakiai
56
Kaunas
Kaliningrad
Greifswald
Niechorze
4
Gdansk
Świnoujście
33
1
30
32
Kamminke
Płoty
2
31
P O L A N D
Szczecin OPAL
Tietierowka
3
214
Gross Köris
GIPL
215
Mallnow
Włocławek
EuRoPoL
Kondratki
38 9
103
102
7
101
Wysokoje
Lwòwek
EuRoPoL
8
216
Rembelszczyzna
Poznań
Kobryn
6
Guben
10
WARSAW
Gubin
29
Łódź
5
Odolanów
Jeleniów
Wronów
11
Lasów
13 12
39
15 14
417
16
Wrocław
VTP-GAZ-SYSTEM
28
17
18
21
Tworzeń
20
22
27
Kouřim
Katowice
Oświęcim
PRAGUE
19
Jarosław
26
Rzeszow
Cieszyn
Skoczów Pogórska Wola
44
Drozdwicze
23
217
Lviv
25
Drozdovychi
Kralice
Žilina
24
Poprad
Veselí nad Lužnicí
Hostim
Figure 2.20: Development of gas transmission system, Poland
2013 – 2016 2017 – 2020 2021 – 2023
Baltic Energy Market Interconnection Plan GRIP 2014–2023 | 37
Made with FlippingBook