City of Morgan Hill Sewer System Master Plan 2017

Dry Weather Flow

1,000 1,200 1,400

Weekend

Weekday

0 200 400 600 800

Flow (gpm)

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

0.0

1,000 1,200 1,400 1,600

0.2

0.4

0 200 400 600 800

0.6

Flow (gpm)

0.8

1.0

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

1,000 1,200 1,400 1,600 1,800

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

0 200 400 600 800

Flow (gpm)

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

LEGEND

Figure 6.3 Site 5 Calibration Barrett Ave and Railroad Ave. Sewer System Master Plan City of Morgan Hill

PRELIMINARY

Rain Event Hydraulic Model

V&A Flow Monitoring V&A Flow Monitoring

June 29, 2016