City of Morgan Hill Sewer System Master Plan 2017

City of Morgan Hill Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

RECOMMENDATIONS

V&A advises that future I/I reduction plans consider the following recommendations:

1. Determine I/I Reduction Program: The City should examine its I/I reduction needs to determine a future I/I reduction program. a. If peak flows, sanitary sewer overflows, and pipeline capacity issues are of greater concern, then priority can be given to investigate and reduce sources of inflow within the basins with the greatest inflow problems. The highest inflow occurred in Basins 3, 7/8 and 9. b. If total infiltration and general pipeline deterioration are of greater concern, then the program can be weighted to investigate and reduce sources of infiltration within the basins with the greatest infiltration problems. i. The highest normalized rainfall-dependent infiltration occurred in Basins 3, 5 and 9. ii. The highest groundwater infiltration occurred in Basins 5 and 6. 2. I/I Investigation Methods: Potential I/I investigation methods include the following: a. Smoke testing. b. Mini-basin flow monitoring. c. Nighttime reconnaissance work to (1) investigate and determine direct point sources of inflow and (2) determine the areas and pipe reaches responsible for high levels of infiltration contribution. 3. I/I Reduction Cost-Effectiveness Analysis: The City should conduct a study to determine which is more cost-effective: (1) locating the sources of inflow and infiltration and systematically rehabilitating or replacing the faulty pipelines or (2) continued treatment of the additional rainfall-dependent I/I flow.

12-0248 AEG CofMorganHill FM Rpt.docx

Page 46 of 46

Made with FlippingBook - Online magazine maker