City of Morgan Hill Sewer System Master Plan 2017

Smart Planning Our Water Resources

August 16, 2017 City of Morgan Hill 17575 Peak Avenue

Morgan Hill California, 95037 Attention: Karl Bjarke, P.E.

Director of Public Works/City Engineer

Subject: 2017 Sewer System Master Plan – Draft Report

Dear Karl: We are pleased to submit the draft report for the City of Morgan Hill Sewer System Master Plan. This master plan is a standalone document, though it was prepared as part of the integrated infrastructure master plans for the water, sewer, and storm drainage master plans. The master plan documents the following: x Existing collection system facilities, acceptable hydraulic performance criteria, and projected wastewater flows consistent with the Urban Planning Area x Development and calibration of the City’s GIS -based hydraulic sewer model. x Capacity evaluation of the existing sewer system with improvements to mitigate existing deficiencies and to accommodate future growth. x Capital improvement program (CIP) with an opinion of probable construction costs and suggestions for cost allocations to meet AB 1600. x Morgan Hill-Gilroy Joint Trunk Analysis/Evaluation We extend our thanks to you, Dan Repp, Deputy Director of Public Works, and other City staff whose courtesy and cooperation were valuable components in completing this study.

Sincerely, AKEL ENGINEERING GROUP, INC.

Tony Akel, P.E. Principal Enclosure: Report

7 4 3 3 N . F I R S T S T R E E T , S U I T E 1 0 3 • F R E S N O , C A L I F O R N I A 9 3 7 2 0 • ( 5 5 9 ) 4 3 6 - 0 6 0 0 • F A X ( 5 5 9 ) 4 3 6 - 0 6 2 2 www.akeleng.com

Made with FlippingBook - Online magazine maker