EC Meeting November 2018
Date Received by HMC
Date Returned by HMC
Status A=No comments B=Returned with comments C=Resubmit
Drawing No.
Revision Drawing Title
" " " " "
15.08.2018 15.08.2018 15.08.2018 01.08.2018 01.08.2018
A A A A A
SK002 SK003
MLB Eng MLB Eng MLB Eng
Elevation view
Anchor bolts 15mm base pit Training block steelwork
M16.241-01 M16.241-02
C2 C2
Sprigg Little Sprigg Little
Hotel extension foundation layout
Hotel extension GF layout showing construction over
"
01.08.2018
A
M16.241-03
C2
Hotel extension first floor layout showing construction over Sprigg Little
" " " " " " " " " " " " " " " "
01.08.2018 16.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 16.08.2018 01.08.2018 16.08.2018 01.08.2018 01.08.2018 20.08.2018
A A A A A A A A A A B A B A A B B B B A C B B A B B B A B B C B C C B C C B B B B B B B B
M16.241-04 M16.241-05 M16.241-06 M16.241-07 M16.241-20 M16.241-21 M16.241-22 M16.241-40 M16.241-41 M16.241-80 M16.241-100 M16.241-101 M16.241-200 M16.241-210 M16.241-211
C1 C3 C1 C1 C2 C2 C2 C2 C2 C1 C8 P1 C6 C1 P1
Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little
Hotel extension typical sections and details sheet 1 Hotel extension typical sections and details sheet 2
Goodacre foundation layout
Goodacre GF layout showing construction over New houses foundation layout and details
New houses ground floor layout and first floor construction Sprigg Little
New houses first floor layout and roof construction Training block foundation layout and details Training block ground floor layout and details
General notes
External works layout Typical gabion wall detail Site wide drainage layout Drainage standard details Manhole type P & PX detail
M16.241-MS-F01
A
Foul sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200 Storm sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200 Storm sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200
"
20.08.2018
M16.241-MS-S01
A
Sprigg Little
"
20.08.2018
M16.241-MS-S02
B
Sprigg Little
" "
15.08.2018 15.08.2018
CN1132-01 CN1132-02 17415-2200 17415-2216
Vision Alu Vision Alu
Fixing detail for pure slide door
Pure slide door
09.08.2018 20.08.2018 09.08.2018 20.08.2018 09.08.2018 20.08.2018 13.08.2018 20.08.2018 13.08.2018 20.08.2018 20.08.2018 20.08.2018 21.08.2018 24.08.2018 12.09.2018 17.09.2018 18.09.2018 27.09.2018 18.09.2018 27.09.2018 18.09.2018 27.09.2018 19.09.2018 27.09.2018
C 04 C 01
C&W C&W Rexel
Training block - ground floor Training block - door details
Goodacre room
SMI-C 22598-DRG-001 A
Style Midlands
Moveable wall details
GetaLit Laminates
Uni colour range
8240-05 8240-03
A&G A&G
Houses GF beam and block Hotel GF beam and block Low level lighting design
B B
D32956/RD
Kingfisher Lighting Amber Precast Ltd
51703 01
P1
Cill, head & gable end coping details
17415-2154 17415-2155
C-00 C-00
C+W C+W GMS
Hotel door schedule
Hotel window schedule & details
GMS/5266/M100
P0
Training room air conditioning and ventilation services
" " " " " " " " " " " " " " " " " " " " " " " " " "
02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018
GMS/5266/M400 GMS/5266/M401 GMS/5266/M402 GMS/5266/M403 GMS/5266/M404 GMS/5266/M405 GMS/5266/M406 GMS/5266/M500
P0 P0 P0 P0 P0 P0 P0 P0
GMS GMS GMS GMS GMS GMS GMS GMS Eco-1 Eco-1 Eco-1 Eco-1 Eco-1 C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W
Heating services layout hotel extension
Domestic water services layout hotel extension Above ground drainage layout hotel extension Plantroom and schematic layout hotel extension
Heating services layout GFTU office
Domestic water services layout GFTU office Above ground drainage layout GFTU
External services layout
27.09.2018 10.10.2018
32956 E-01 180062-E-01
A A
Electrical services
10.10.2018
Electrical services lighting and fire alarm ground floor
10.10.2018 10.10.2018 10.10.2018
180062-E-02 180062-E-03 180062-E-04 17415-2401 17415-2403 17415-2407 17415-2408 17415-2409 17415-2410 17415-2401 17415-2403 17415-2406 17415-2407 17415-2408 17415-2409 17415-2410 M16.241-06 M16.241-07 M16.241-20
A A A
Electrical services small power ground floor Electrical services lighting and fire alarm first floor Electrical services small power first floor Residential units proposed ground floor plan Residential units proposed first floor plan New housing units proposed sections sheet 1 New housing units proposed sections sheet 2 New housing units proposed elevations sheet 1 New housing units proposed elevations sheet 2 Residential units proposed ground floor plan Residential units proposed first floor plan New housing units proposed sections sheet 1 New housing units proposed sections sheet 2 New housing units proposed elevations sheet 1 New housing units proposed elevations sheet 2 Residential units proposed roof plan
04.10.2018
tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc
tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc
C-03 C-02 C-00 C-00 C-00 C-00 C03 C-02 C-00 C-01 C-01 C-00 C-00
11.10.2018
C3 C3 C3
Sprigg Little Sprigg Little Sprigg Little
Goodacre foundation layout
Goodacre GF layout showing construction over New houses foundation layout and details