EC Meeting November 2018

Date Received by HMC

Date Returned by HMC

Status A=No comments B=Returned with comments C=Resubmit

Drawing No.

Revision Drawing Title

" " " " "

15.08.2018 15.08.2018 15.08.2018 01.08.2018 01.08.2018

A A A A A

SK002 SK003

MLB Eng MLB Eng MLB Eng

Elevation view

Anchor bolts 15mm base pit Training block steelwork

M16.241-01 M16.241-02

C2 C2

Sprigg Little Sprigg Little

Hotel extension foundation layout

Hotel extension GF layout showing construction over

"

01.08.2018

A

M16.241-03

C2

Hotel extension first floor layout showing construction over Sprigg Little

" " " " " " " " " " " " " " " "

01.08.2018 16.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 01.08.2018 16.08.2018 01.08.2018 16.08.2018 01.08.2018 01.08.2018 20.08.2018

A A A A A A A A A A B A B A A B B B B A C B B A B B B A B B C B C C B C C B B B B B B B B

M16.241-04 M16.241-05 M16.241-06 M16.241-07 M16.241-20 M16.241-21 M16.241-22 M16.241-40 M16.241-41 M16.241-80 M16.241-100 M16.241-101 M16.241-200 M16.241-210 M16.241-211

C1 C3 C1 C1 C2 C2 C2 C2 C2 C1 C8 P1 C6 C1 P1

Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little Sprigg Little

Hotel extension typical sections and details sheet 1 Hotel extension typical sections and details sheet 2

Goodacre foundation layout

Goodacre GF layout showing construction over New houses foundation layout and details

New houses ground floor layout and first floor construction Sprigg Little

New houses first floor layout and roof construction Training block foundation layout and details Training block ground floor layout and details

General notes

External works layout Typical gabion wall detail Site wide drainage layout Drainage standard details Manhole type P & PX detail

M16.241-MS-F01

A

Foul sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200 Storm sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200 Storm sewer system, manhole schedule (to be read in conjunction with SLP Ltd dwg M16.241.200

"

20.08.2018

M16.241-MS-S01

A

Sprigg Little

"

20.08.2018

M16.241-MS-S02

B

Sprigg Little

" "

15.08.2018 15.08.2018

CN1132-01 CN1132-02 17415-2200 17415-2216

Vision Alu Vision Alu

Fixing detail for pure slide door

Pure slide door

09.08.2018 20.08.2018 09.08.2018 20.08.2018 09.08.2018 20.08.2018 13.08.2018 20.08.2018 13.08.2018 20.08.2018 20.08.2018 20.08.2018 21.08.2018 24.08.2018 12.09.2018 17.09.2018 18.09.2018 27.09.2018 18.09.2018 27.09.2018 18.09.2018 27.09.2018 19.09.2018 27.09.2018

C 04 C 01

C&W C&W Rexel

Training block - ground floor Training block - door details

Goodacre room

SMI-C 22598-DRG-001 A

Style Midlands

Moveable wall details

GetaLit Laminates

Uni colour range

8240-05 8240-03

A&G A&G

Houses GF beam and block Hotel GF beam and block Low level lighting design

B B

D32956/RD

Kingfisher Lighting Amber Precast Ltd

51703 01

P1

Cill, head & gable end coping details

17415-2154 17415-2155

C-00 C-00

C+W C+W GMS

Hotel door schedule

Hotel window schedule & details

GMS/5266/M100

P0

Training room air conditioning and ventilation services

" " " " " " " " " " " " " " " " " " " " " " " " " "

02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018 02.10.2018

GMS/5266/M400 GMS/5266/M401 GMS/5266/M402 GMS/5266/M403 GMS/5266/M404 GMS/5266/M405 GMS/5266/M406 GMS/5266/M500

P0 P0 P0 P0 P0 P0 P0 P0

GMS GMS GMS GMS GMS GMS GMS GMS Eco-1 Eco-1 Eco-1 Eco-1 Eco-1 C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W C+W

Heating services layout hotel extension

Domestic water services layout hotel extension Above ground drainage layout hotel extension Plantroom and schematic layout hotel extension

Heating services layout GFTU office

Domestic water services layout GFTU office Above ground drainage layout GFTU

External services layout

27.09.2018 10.10.2018

32956 E-01 180062-E-01

A A

Electrical services

10.10.2018

Electrical services lighting and fire alarm ground floor

10.10.2018 10.10.2018 10.10.2018

180062-E-02 180062-E-03 180062-E-04 17415-2401 17415-2403 17415-2407 17415-2408 17415-2409 17415-2410 17415-2401 17415-2403 17415-2406 17415-2407 17415-2408 17415-2409 17415-2410 M16.241-06 M16.241-07 M16.241-20

A A A

Electrical services small power ground floor Electrical services lighting and fire alarm first floor Electrical services small power first floor Residential units proposed ground floor plan Residential units proposed first floor plan New housing units proposed sections sheet 1 New housing units proposed sections sheet 2 New housing units proposed elevations sheet 1 New housing units proposed elevations sheet 2 Residential units proposed ground floor plan Residential units proposed first floor plan New housing units proposed sections sheet 1 New housing units proposed sections sheet 2 New housing units proposed elevations sheet 1 New housing units proposed elevations sheet 2 Residential units proposed roof plan

04.10.2018

tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc

tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc tbc

C-03 C-02 C-00 C-00 C-00 C-00 C03 C-02 C-00 C-01 C-01 C-00 C-00

11.10.2018

C3 C3 C3

Sprigg Little Sprigg Little Sprigg Little

Goodacre foundation layout

Goodacre GF layout showing construction over New houses foundation layout and details

[ 2/3 ]

Made with FlippingBook - Online Brochure Maker