EC Meeting November 2018
Section Two - Progress
2.1 Progress
Programme Reference / Revision
Construction programme
No.
Operation
Planned % Complete
Actual % Complete
Plus Or Minus days
Remarks
REDUCE LEVEl Sections 1,6 AND 4
100
60
Re commence after garage removal
6
Hotel Car park
Section Heading
10
Remove arrisings
Asbestos pile still to sift
100
100
27
Pipework to new fire hydrant
WC 13/08/18
100
100
32
CCTV survey
100
0
34
Make good disturbed areas
100
90
35
Construct Temp bin store
Awaiting design
100
0
36
Lamp posts and bollards
Delivered 13/08/18
100
50
37
Final stone blinding
100
100
38
Block Paving
WC 27/08/18
100
100
39
New Tarmac
Wearing course to do
100
90
40
Timber Fencing
100
0
41
Wire Fencing
This will be in the residential section
100
0
42
Topsoil
100
30
43
Remove site fencing
100
100
44
Snagging /Handover
100
0
45
Existing Nursery
Section heading
46
Construction
Sub heading
47
External Scaffold
On going
100
100
60
Install new drainage to ground floor
100
100
61
Construct superstructure walls
100
100
63
Fix wall plate and straps
100
100
67
Flat roof joists
100
100
68
Flat roof boarding
100
100
69
Install roof insulation/coverings
100
100
70
Parapets and cappings
100
90
71
Install windows and doors
100
100
72
Install roof trusses and bracings
100
100
73
Install facias and soffits
100
100
74
Document 6 (06/01/17)