EC Meeting November 2018

Section Two - Progress

2.1 Progress

Programme Reference / Revision

Construction programme

No.

Operation

Planned % Complete

Actual % Complete

Plus Or Minus days

Remarks

REDUCE LEVEl Sections 1,6 AND 4

100

60

Re commence after garage removal

6

Hotel Car park

Section Heading

10

Remove arrisings

Asbestos pile still to sift

100

100

27

Pipework to new fire hydrant

WC 13/08/18

100

100

32

CCTV survey

100

0

34

Make good disturbed areas

100

90

35

Construct Temp bin store

Awaiting design

100

0

36

Lamp posts and bollards

Delivered 13/08/18

100

50

37

Final stone blinding

100

100

38

Block Paving

WC 27/08/18

100

100

39

New Tarmac

Wearing course to do

100

90

40

Timber Fencing

100

0

41

Wire Fencing

This will be in the residential section

100

0

42

Topsoil

100

30

43

Remove site fencing

100

100

44

Snagging /Handover

100

0

45

Existing Nursery

Section heading

46

Construction

Sub heading

47

External Scaffold

On going

100

100

60

Install new drainage to ground floor

100

100

61

Construct superstructure walls

100

100

63

Fix wall plate and straps

100

100

67

Flat roof joists

100

100

68

Flat roof boarding

100

100

69

Install roof insulation/coverings

100

100

70

Parapets and cappings

100

90

71

Install windows and doors

100

100

72

Install roof trusses and bracings

100

100

73

Install facias and soffits

100

100

74

Document 6 (06/01/17)

Made with FlippingBook - Online Brochure Maker