EC Meeting November 2018
Demolition of lodge
100
100
252
New Houses and apartments
Heading
253
Isolate existing services
100
66
254
Further survey
100
100
255
Remove / protect trees
100
100
256
Remove BT overhead poles
100
100
257
Protect existing gas and electric subs
100
100
258
Remove existing bin store
100
100
259
Remove concrete slab
100
100
260
Strip existing car park kerbs etc
100
100
261
Remove fencing
100
100
262
Demolish existing walls
Awaiting gas scheme
100
98
263
Remove shrubs and plants
100
100
264
Remove protect trees
100
100
265
Strip topsoil
100
100
266
Reduce level
Awaiting gas scheme
100
98
267
Stone to road
Awaiting gas scheme
90
50
268
2.2 Overall Summary of Progress
External light installation to be completed wc 15/10 to phase 2 and temp car park Roofing completed to GFTU archive and training rooms 1 st fix M+E in progress to GFTU Plastering to GFTU in progress 1 st fix joinery to GFTU completed 2 nd fix joinery to GFTU commenced Screed to archive and training rooms complete Hotel blockwork complete for pcu installation on 18/10/18 Service trench to GFTU in progress . will resume after crane visits this week Reduce level dig to residential completed as far as practicable Foundations to residential to commence 15/10 Isolation of services affecting Goodacre works completed Goodacre temp propping and demolition of walls completed Breakout of Goodacre floor for bases/underpinning to commence 15/10
Document 6 (06/01/17)