Oil & Gas UK Decommissioning Insight 2014
There is a higher forecast cost per tonne for topside and substructure removal in the southern North Sea and Irish Sea (see Figure 16). This could be attributed to the fact that a vessel will have the same mobilisation costs for removing a small 500-tonne NUI or a larger structure, as well as due to the longer duration of removals in the CNS and NNS areas which, in turn, reduce the cost per tonne. Although the cost per tonne is higher in the SNS and IS, the variation across the UKCS is relatively small. Figure 16: Historical Variation in the Removal Cost per Tonne Forecasts for Topsides and Substructures in the Southern North Sea and Irish Sea (2011 to 2014 Surveys)
1
2
3
10,000
4
8,000
6,000
5
4,000
2,000
6
Estimated Cost per Tonne (£)
0
2011
2012 2013 2014
2012 2013 2014
7
Topside & Substructure
Topside
Substructure
Average Forecast Topside Removal Cost Per Tonne Average Forecast Substructure Removal Cost Per Tonne Average Forecast Topside & Substructure Removal Cost Per Tonne
Range in Cost Forecasts
Source: Oil & Gas UK
Removal Cost per Tonne
2013 Average
2014 Average
Topsides
£3,600 £5,700
£4,000 £4,500
Substructures