Bundles and towed installation
Bundles and towed installation
21
BUNDLE ASSEMBLY AT TAIN
Bundle being
assembled
Fabrication
NDT
Field joints
Spacer attachment
The above slide depicts a bundle being assembled at Smit Land and Marine facility in Tain and shows: The fabrication building The NDT area The building for the completion of the field joints The building for the attachment of the first part of the spacer units There are currently two permanent bundle construction sites in Scotland, one in West Africa and one in Brazil. There are temporary sites in Australia and the Arctic.
SUBSEA7’SÅSGARDBUNDLERAIL-LAUNCHEDTRAILHEAD
SUBSEA 7’S ÅSGARD BUNDLE RAIL-LAUNCHED TRAIL HEAD
Made with FlippingBook Annual report