Bundles and towed installation
Bundles and towed installation
33
SURFACE TOW
Not normally used in open sea conditions Dependent upon environmental conditions Fatigue in heavy seas Careful control needed whilst lowering bundle to the seabed at the end of the tow Release of buoys by ROV or divers Safety issue
Tug
Surface tow: The bundle is towed on the surface of the water with or without additional temporary buoyancy tanks; This is not normally used in open sea conditions; It is very dependent upon the environmental conditions; Assessment of fatigue is required in the tail end of the pipeline for long tows through waves; Careful survey/tug control is involved in lowering the bundle to the seabed at the end of the tow. This system was used in West Africa to load out a rigid steel W riser to an SPM.
CONTROLLED-DEPTHSURFACE ORNEAR-SURFACETOW
CONTROLLED-DEPTH SURFACE OR NEAR-SURFACE TOW
Tow direction
Tubular buoyancy attached to lines
DSV tug
Riser top assembly (buoyant unit)
Riser bottom assembly
Made with FlippingBook Annual report