OMB_Meeting_Book-11-2016
AOAC OMB Teleconference Materials
196
Modification to PTM Certifications/Method Claims • Three levels of modifications for PTMs – Level 1 = only internal review and decision required
– Level 2 = only method developer data with method volunteer review required
– Level 3 = method developer study and independent laboratory study with peer review
• Level 1 and Level 2 modifications can be submitted as part of the PTM Annual Certification Renewal process • Modification application must be submitted
• Modifications are determined on an individual basis
11/09/2016
Made with FlippingBook