Comprehensive Transportation Plan - March 2019

PROJECT SHEETS

NC 54 (Chapel Hill Road)

2010 – n/a Widening

Length 0.46 miles

Project Extents

From: Northern Town Limits near Shiloh Glenn Drive To: NC 540

Traffic Volume (vpd) Street Hierarchy 2010 – 21,956 2040 – 51,730 Major Thoroughfare Congestion (v/c ratio)

Planning Cost Estimate July 2017

2010 – 0.60 2040 – 0.68

$10,302,000 Crash Summary (June 2013 to May 2016) Total Crashes – 15 EPDO Score – 120.4

CROSS-SECTION

KEY STANDARD DIMENSIONS

NOTES:

11-ft inside lanes

12-ft dedicated bus lane

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.

17.5-ft planted median

0-ft to 10-ft verge 10-ft sidepath east side of roadway 5-ft sidewalk