NC 54 (Chapel Hill Road)

2010 – n/a Widening

Length 0.30 miles

Project Extents

From: NW Cary Parkway To: Wilson Road Traffic Volume (vpd) Street Hierarchy

2010 – 24,366 2040 – 26,566

Major Thoroughfare

Planning Cost Estimate July 2017

Congestion (v/c ratio)

2010 – 1.31 2040 – 1.43

$ 5,152,000 Crash Summary (June 2013 to May 2016) Total Crashes – 27 EPDO Score – 226.8

CROSS-SECTION

KEY STANDARD DIMENSIONS

NOTES:

11-ft inside lanes

12-ft dedicated bus lanes

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.

17.5-ft planted median

0-ft to 10-ft verge 10-ft sidepath east side of roadway 5-ft sidewalk