Conversion Catalogue
KHS Innopro
KHS Innopro O+H INTERMIX OPTIMIZATION CLEANING CYCLE EN
TECHNICAL UPGRADE
Suitability
INTERMIX C mixer Basic requirement: O+H PLC Upgrade Simatic S7
Scope of supply
Description
Injection grouting lance
At the beginning of a cleaning cycle, the water dosing tank (B3) is filled to the point of overflowing. Subsequently, the cleaning agent enters the pressure compensation pipe between the tank (B3) and the storing tank (B5). Through the inclusion of spray nozzles in the compensation pipe and an appropriate software modification, the time-consuming overflow of the tank B3 may be entirely omitted. In addition, the idle time needed for the tank's discharge decreases significantly. This upgrade facilitates a nearly continuous flow of the cleaning agent.
Spray nozzles
Spray nozzle pipes
Beverage pipe
Threaded connection
Fitting materia
Software update
Contact
Benefit
Siegfried.Buchholz@KHS.com
Increase in productivity due to the reduced cleaning cycle (up to 10% added production time)
Conversions time / Delivery time
Reduction of consumption data
Duration for on-site installation and commissioning: 2-3 days
KHS Corpoplast GmbH
Meiendorfer Straße 203
22145 Hamburg
Deutschland
Tel: +49.40.67.907 0
info@khs.com
* Subject to technical modifications and price changes. On request, we will be glad to provide you with a binding offer. Version 1 Date 31.04.2014
Made with FlippingBook