Conversion Catalogue

KHS Innopro

KHS Innopro O+H INTERMIX OPTIMIZATION CLEANING CYCLE EN

TECHNICAL UPGRADE

Suitability

INTERMIX C mixer Basic requirement: O+H PLC Upgrade Simatic S7

Scope of supply

Description

Injection grouting lance

At the beginning of a cleaning cycle, the water dosing tank (B3) is filled to the point of overflowing. Subsequently, the cleaning agent enters the pressure compensation pipe between the tank (B3) and the storing tank (B5). Through the inclusion of spray nozzles in the compensation pipe and an appropriate software modification, the time-consuming overflow of the tank B3 may be entirely omitted. In addition, the idle time needed for the tank's discharge decreases significantly. This upgrade facilitates a nearly continuous flow of the cleaning agent.

Spray nozzles

Spray nozzle pipes

Beverage pipe

Threaded connection

Fitting materia

Software update

Contact

Benefit

Siegfried.Buchholz@KHS.com

 Increase in productivity due to the reduced cleaning cycle (up to 10% added production time)

Conversions time / Delivery time

 Reduction of consumption data

Duration for on-site installation and commissioning: 2-3 days

KHS Corpoplast GmbH

Meiendorfer Straße 203

22145 Hamburg

Deutschland

Tel: +49.40.67.907 0

info@khs.com

* Subject to technical modifications and price changes. On request, we will be glad to provide you with a binding offer. Version 1 Date 31.04.2014

Made with