Submittal #HH-2062 . 0 09510 - Acoustical Panel Ceilings
HOK
RECEIVED 06/18/2018
Project: LGA550 - Headhouse LaGuardia Airport Hangar 5A Runway Drive Flushing, New York 11371
SWJV 250 West 34th Street, One Pennsylvania Plaza, 41st Floor New York, New York 10019
Roof Deck Ceiling Clip
SPEC SECTION:
CREATED BY:
09510 - Acoustical Panel Ceilings
STATUS:
DATE CREATED:
Open
06/18/2018
ISSUE DATE: RESPONSIBLE CONTRACTOR: RECEIVED DATE: REQUESTED RESPONSE DATE: FINAL DUE DATE: TAA NUMBER(S) DJV SUBMITTAL # SWJV DISAGREES WITH CA SUBMITTAL CLASSIFICATION: RELATED TO LGP/PA CHANGE ORDER: TYPE:
REVISION:
06/18/2018
0
RECEIVED FROM:
Robert Doxey
Cord Contracting Co. Inc
SUBMIT BY:
//
//
SUBMITTED FOR: Approval
LOCATION:
06/28/2018
Product Information
3142.07
----
SWJV REASON FOR DISPUTING CA CLASSIFICATION: LGP/PA CHANGE ORDER NO.:
No
No
APPROVERS:
Yuhong Cao (HOK)
BALL IN COURT: Yuhong Cao (HOK) DISTRIBUTION: James Christerson (HOK) , Radhika Deshpande (HOK) , Noemi Fogarasi (HOK) , Alexis Park (HOK) , Brian Henkel (HOK) , Nick Duch (HOK) , Eduardo Mujica (HOK) , Ava Hamilton (HOK) , Mourad Kicha (HOK) , Paul De Voe (HOK) , Monique Marian (HOK) DESCRIPTION: Attached is the submittal for the custom clip detail to be used to attach to the underside of the roof deck. This clip is to be used to hang the acoustical ceiling tile from the roof deck in lieu of using the support system that spans from beam to beam. This is quicker and easier system to install. If acceptable we would also like to use this to hang the sheetrock ceilings as well ATTACHMENTS: HH-2062.0-09510 Roof Deck Ceiling Clip.pdf
SUBMITTAL WORKFLOW # NAME
SUBMITTER/ APPROVER SENT DATE DUE DATE RETURNED DATE RESPONSE ATTACHMENT S
COMMENTS
1
Yuhong Cao
Approver
6/18/2018 6/28/2018
Pending
LaGuardia Airport Central Terminal Building Replacement Project
LaGuardia Airport Central Terminal Building Replacement Project
Refer additional notes inside added by the Architect. Load checked against ultimate load 400lbs. per hanger. (yhc/HOK)
Parsons Brinckerhoff / HOK Design Joint Venture
Parsons Brinckerhoff / HOK Design Joint Venture
May proceedwith theWork coveredby this Submittal provided it complieswith theContract Documents. Commentsand corrections donot authorize changes to theContractDocuments. Donotproceedwith theWork coveredby this Submittal. Limit corrections in resubmissions to itemsnoted in thisSubmittal.
A B C D
Approved Approved as Noted Revise as Noted and Resubmit Rejected Reviewed for Information as Noted Reviewed for Information
May proceedwith theWork coveredby this Submittal provided it complieswith theContract Documents. Commentsand correctionsdo not authorize changes to theContractDocuments. Donotproceedwith theWork covered by this Submittal. Limit corrections in resubmissions to itemsnoted in thisSubmittal.
A B C D
Approved Approved as Noted Revise as Noted and Resubmit Rejected Reviewed for Information as Noted Reviewed for Information
E F
ThisSubmittal is for informationonly. Resubmitonly if noted in this submittal.
E F
ThisSubmittal is for information only. Resubmitonly if noted in this submittal.
B
B
ACTION REQUIRED pproved as Noted
ACTION REQUIRED pproved as Noted
Review of thisSubmittal is for the limited purpose of checking for conformancewith information given and the design concept expressed in theContractDocuments.The review isnot fordetermining the accuracy or completeness of other details such as dimensions and quantities,or for substantiating instructions for installation or performance of equipment or systems,which remains theContractor's responsibility. Review shallnot constitute approval of safety precautions, or of constructionmeans, methods, and techniques, sequences or procedures. Approval of a specific item shall not indicate approval ofanassemblyofwhich the item is a component.This review shall not serve as awarranty for the benefit of the contractor.
Review of thisSubmittal is for the limitedpurposeof checking for conformancewith informationgiven and thedesign concept expressed in theContractDocuments.The review is not for determining theaccuracy or completenessof other details suchas dimensions andquantities, or for substantiating instructions for installation or performanceofequipmentor systems,which remains theContractor's responsibility. Review shall not constituteapproval of safety precautions, or of constructionmeans, methods,and techniques, sequences or procedures. Approvalofa specific item shall not indicateapproval of an assembly ofwhich the item is a component.This review shall not serve asawarranty for thebenefit of the contractor.
ReviewedBy:
ReviewedBy:
eduardo.mujica 07/02/2018
yuhong.cao 04/08/2019
SubmittalFile:
SubmittalFile:
SWJV
Page 1 of 1
Printed On: 06/18/2018 04 :13 PM HH-2062.0 Roof Deck Ceiling Clip.pdf
HH-2062.0 Roof Deck Ceiling Clip_Rev01_HOK.pdf