REA Final - 22 Dec 20 - eBook - 1682 pages

EXTRA WORK ORDER

Number:

26

Date:

17-Nov 19 LGA PBB 620-027

PO Box 575 Fort Montgomery, NY 10922 To: Spearhead Construction

Project Number: Project Name:

LGA Pedestrian Bridge B and BOH

Project Location:

From:

Performed EXTRA work Directed by SWJV. Wall type change at 4th floor.

Description:

LABOR Date

Crew Size Trade

Total Hours

Hours (ea)

ST - PT - OT/DT

4

4 .0

16 .0

17-Nov 19

Carpenters OT/DT

Product # MATERIAL

Quantity

Item Description

UOM

if necessary, continued on page 2

*** Verification of Ti me and M aterial only ***

Brian Carr

Zack Trause

Spearhead Foreman:

Verified by:

Signature (Hereunto Duly Authorized)

Signature

The Contractor's Acceptance of this Change Order acknowledegs that (i) Spearhead Construction, Inc, is authorized and directed to perform the above work, (ii) the performance of said work is outside the scope of Spearhead Construction, Inc's work under the Subcontract for the project referenced above, (iii) Contractor has obligation to pay for said work in accordance with the terms of the Contract.

Made with FlippingBook - professional solution for displaying marketing and sales documents online