EXTRA WORK ORDER
Number:
26
Date:
17-Nov 19 LGA PBB 620-027
PO Box 575 Fort Montgomery, NY 10922 To: Spearhead Construction
Project Number: Project Name:
LGA Pedestrian Bridge B and BOH
Project Location:
From:
Performed EXTRA work Directed by SWJV. Wall type change at 4th floor.
Description:
LABOR Date
Crew Size Trade
Total Hours
Hours (ea)
ST - PT - OT/DT
4
4 .0
16 .0
17-Nov 19
Carpenters OT/DT
Product # MATERIAL
Quantity
Item Description
UOM
if necessary, continued on page 2
*** Verification of Ti me and M aterial only ***
Brian Carr
Zack Trause
Spearhead Foreman:
Verified by:
Signature (Hereunto Duly Authorized)
Signature
The Contractor's Acceptance of this Change Order acknowledegs that (i) Spearhead Construction, Inc, is authorized and directed to perform the above work, (ii) the performance of said work is outside the scope of Spearhead Construction, Inc's work under the Subcontract for the project referenced above, (iii) Contractor has obligation to pay for said work in accordance with the terms of the Contract.