REA Final - 22 Dec 20 - eBook - 1682 pages

Meeting #10

RFIs and Submittals No Meeting Origin Title

Assignment

Due Date Priority Status Old/New?

3.1

1

RFI Status Ongoing High Open Old Description: Spearhead to proceed with access doors submittals. If any new locations are added, SWJV to notify Spearhead. No new RFIs at this time. Previous Meeting Minutes: 4/29/2019 - No new RFIs at this time 4/9/2019 - Spearhead to submit RFI for confirmation of control joint thickness and type between GFRC and gyp, gyp and GFRG, and within the gyp straight piece. All previous RFIs have been closed. 3/19/2019 - Spearhead will address RFI-0078 with control joint shop drawing submittal. 3/12/2019 - Spearhead to revise RFI-0078 based on control joint drawings. For RFI-0072, fastening to bottom flutes of deck seems to be only viable option. SWJV to review and work with Spearhead to finalize proposal to submit to HOK. - SWJV reached out to Manny for tenant drawings. Meeting with LGP this week. Drawings should follow within a few weeks after that. SWJV to continue to check in and update Spearhead. - Spearhead has confirmed no further RFIs at this point, inclusive of any changes via Rider D drawings. See 4/2/2019 Meeting Minutes for Previous Notes Description: Spearhead to submit fastening system submittals as one package. Framing shop drawings and calculations are R&R and should be provided by Spearhead prior to next week’s meeting. Head of Wall Tracks submittal is pending in HOK’s court. Approval for Armstrong submittal does not exist at HH; Spearhead to revise and resubmit per HOK comments. Previous Meeting Minutes: 4/29/2019 – Spearhead to submit soffit/ceiling drawings. SWJV to check HH submittals for Armstrong Grid System. 4/9/2019 - Moving forward, for any calculations, Spearhead to have engineer include an acceptable range for seismic angles. Spearhead to submit fastening system, and Blue Banger Hanger system substitution if plan on using. Meeting with HOK and Plasterform on Wed to review the CAD file for the truss capitals per R&R submittal comments. Plasterform to finalize revised shop drawings after meeting and resubmit. Spearhead to receive pricing from Corinthian for GFRC by Friday 4/12, and advise if setting up visit. 4/2/2019 – Joint Sealant will be separate submittal. SWJV to follow up regarding Armstrong Substitution and CJ drawings. -Spearhead to provide update on status of Corinthian fabricating GFRC. Need to submit qualifications and product data for Corinthian. 3/26/2019 - SWJV investigating if CJ shop drawings are required. If Spearhead is not moving CJs from design drawings do shop drawings need to be submitted? Ref: Spec 1.4C and Rider D drawings. -Spearhead to submit Gyp. Board Schedule separately. -Spearhead to breakout submittal for Hilti shots. Spearhead to discuss with Hilti rep for an alternate to using powder actuated shots. -Plasterform adjusting drawings based on DJV comments. 3D model for column capitals will be sent via Sharepoint to help DJV review of shop drawings. -Spearhead will send submittal for pressure treated wood for blocking. 3/19/2019 - Spearhead to submit Armstrong Ceiling Grid. -Spearhead evaluating framing at truss enclosures to see if the amount of framing can be reduced. 3/12/2019 - Spearhead expecting GFRG sample from Plasterform by next week. - Spearhead to break out product data for Hilti shots to submit for separate approval. - Armstrong substitute submitted by Spearhead 3/11; need to add shop drawing for Area BF and resubmit to SWJV. - Gyp Assemblies product data revised and submitted by Spearhead 3/11; SWJV to submit to HOK - GFRC base, fire shutter, shaftwalls submitted by Spearhead 3/11 w/o stamp; SWJV to submit to HOK; Spearhead to follow- up with stamped versions for final submittal to HOK - Spearhead working on revision of framing calculation submittal for resubmission. - SWJV to send approved unistrut product data to Spearhead for review. SWJV will verify if we need a separate submittal for Spearhead or if they can use product data already approved for ACT. - Spearhead to submit remaining framing and layout shop drawings for GFRC framing, soffits, walls, ceilings. See 4/2/2019 Meeting Minutes for Previous Notes SWJV & Spearhead Submittal Status SWJV & Spearhead Ongoing High Open Old

3.2

1

3.3 2

MEPFP Coordination

SWJV

3/8/2019 Medium Open Old

Description: Meeting with Celtic scheduled for next week. Sketch provided by misc. metals fabricator reviewed.

3

Made with FlippingBook - professional solution for displaying marketing and sales documents online