Skanska/Walsh Joint Venture LaGuardia Airport Hangar 5A Runway Drive Flushing, NY 11371
February 24, 2020
Andee Hidalgo Spearhead Construction, LLC PO Box 575 Fort Montgomery, NY 10922
Via Procore: andee@spearheadcx.com
RE: LaGuardia Airport Central Terminal Building Replacement Project (the “ Project ”); Subcontract No. 620-027 (the “ Subcontract ”) between Skanska/Walsh Joint Venture (“ SWJV ”) and Spearhead Construction LLC (“ Spearhead ); Spearhead Damage to Brooklyn Diner Millwork by Spearhead lift.
Ms. Hidalgo:
It has been brought to SWJV’s attention that Spearhead was operating a scissor lift on Sunday, February 23, 2020 within the tenant space of the Brooklyn Diner located on the 4th floor of Pedestrian Bridge B. Spearhead had advised SWJV that their work was complete within the Brooklyn Diner. The attached photo(s) show Spearhead employees performing work within the Brooklyn Diner. While Spearhead entered and worked in the space without notifying or attempting to coordinate with SWJV, it was observed that the millwork was damaged by the scissor lift being operated by Spearhead personnel. This is a setback to the work schedule of Holt and LGP, with potential costs and impacts that will be the responsibility of Spearhead. This Brooklyn Diner restricted area has been reiterated at the 6:30am Forman meeting the morning prior to the incident of Monday, February 24, 2020. This incident could have been avoided, had Spearhead personnel properly communicated this to their team members.
SWJV reserves all rights and remedies under the Subcontract and at law and equity.
Sincerely,
Frank Corallo Pedestrian Bridge B Area Manager
cc.
Brian Mock; John Dolan; Sean Szatkowski
Attachments: RE Brooklyn Diner - Bridge Work.pdf
Page 1 of 1
PBB-10019-200224-Spearhead Damage to Brooklyn Diner Millwork by Spearhead lift jb