R E : LGA - PBB - P r elim W or k S ched u le T r a us e , Z acha ry < z acha ry . tr a us e @ s kan s ka w al s h . c o m > T h u 5/16/2019 2 55 PM

T o : S ean < s ean @ sp ea r headc x . c o m >; A ndee < andee @ sp ea r headc x . c o m >; G a ry < G a ry @ sp ea r headc x . c o m > C c : M o ck , B r ian < b r ian . m o ck @ s kan s ka w al s h . c o m >; C or all o , F r ank < F r ank . C or all o @ s kan s ka w al s h . c o m > Sean – As discussed on Tuesday, please see general comments below and in red per email below from our superintendents in regards to your proposed sequence plan. SWJV will provide an overall schedule as soon as possible, as we are inputting subcontractors’ durations and schemes now. Let me know if any questions, thank you. Per meeting Tuesday, ideally the BOH/Feature Wall space is to be awarded early next week. Please send revised BOH proposal as reviewed in meeting with Gene. If this becomes Spearhead’s scope of work, this is high priority and will be treated as a separate scope with own foreman and crew in order to work in conjunction with “Scope #1”. Spearhead to provide an average duration for: · GFRC base installation · GYP angled encasement installation · GFRG capital installation Zack Trause Project Engineer

SKANSKA WALSH Design-Build Joint Venture LaGuardia Airport CTB Replacement Project Hangar 5A Runway Drive Flushing, NY 11371 Mobile: (917) 565-6140 Think twice before you press "print."

This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy nor deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you.

From: Sean Sent: Tuesday, May 7, 2019 3:01 PM To: Trause, Zachary Cc: Mock, Brian ; Corallo, Frank ; Andee ; Gary Subject: LGA - PBB - Prelim Work Schedule Zack,

As discussed at the meeting today, here is a basic schedule about how we are planning to perform the work.  This is only broken down into (4) categories, and is meant to highlight the progression of our work.  Feedback is welcome.