The UK Offshore Oil and Gas Fabricators Directory 2015

Capabilities and Capacities (continued) Cranage – Lifting Capacity and Hook Height (Tonnes and Metres)

Dockside and Jetty • Duchy crane – 25 tonnes, hook height 22.9 metres/12 tonnes, hook height 42.7 metres • No 2 dock east – 48 tonnes, hook height 28.9 metres/15 tonnes, hook height 47.5 metres • No 3 dock east – 12 tonnes, hook height 14 metres/3 tonnes, hook height 39 metres • No 2 dock west – 10 tonnes, 18.9 metres/3.75 tonnes, hook height 50 metres • 3-4 docks – 60 tonnes, hook height 18.9 metres/19 tonnes, hook height 50 metres • No 2 dock west – 45 tonnes, hook height 31 metres/30 tonnes, hook height 40 metres Mobile cranes • Iron fairy – 6 tonnes, hook height 2.4 metres • Demag AC100 – 100 tonnes, hook height 3 metres 12.5 metres jib/ 1.7 tonnes, hook height 46 metres 50.2 metres jib • Liebherr 150 Litronic – 40 tonnes, hook height 16 metres/ 13.7 tonnes, hook height 32 metres Workshops and overhead gantry • Engineering workshop – 1 x 40 tonnes, 1 x 15 tonnes, 2 x 10 tonnes • Fabrication/plumbers workshop – 3 x 8 tonnes

• Electricians shop – 1 x 10 tonnes • Cleaning shop – 1 x 3.2 tonnes • Maintenance garage – 1 x 2 tonnes, 1 x 3 tonnes • Paint shop – 1 x 3 tonnes

• Compressor house – 1 x 4 tonnes • Wharf load-out – 50 tonnes/m 2 • <70 tonnes/m 2 selected areas wharf

Load-Out Capacity (Tonnes)

• Not provided

Minimum Water Depth (Metres) Maximum Water Depth (Metres)

• 0.8 metres above chart datum (CD)

• 5.4 metres above CD mean high water springs

>

page 12