The UK Offshore Oil and Gas Fabricators Directory 2015
Projects and Markets Fabrication Tonnage (Last Three Years)
(continued)
Circa 15,500 tonnes
Fabrication Revenue/Turnover (Last Three Years)
2011 – £24,608,000 2012 – £42,162,000 2013 – £32,023,000
Ability To Build Large Structures Under Cover (Yes/No)
• Yes – the 30,000 m 2 fabrication halls have vast capacity with doors 40 metres wide by 18 metres tall, meaning that most oil and gas and marine structures can be completed and outfitted under cover. • In addition, there are four painting and blasting cells located alongside the main building dock. The largest of which is 70 metres x 30 metres x 19 metres (apex height) served by the Gantry Crane. The roof is removable to allow products to be placed in position and the height to be increased.
>
page 68
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2015