The UK Offshore Oil and Gas Fabricators Directory 2015
Projects and Markets (continued)
Greater Gabbard Topsides Client: EPC Completion Date: 2009 Structure: Contract:
Siemens Energy
Offshore wind substation topside
Weight Topside:
2,100 tonnes Size (Length x Width x Height) Topside:
39 x 31 x 18 metres
>
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2015
page 77
Made with FlippingBook