Draft Comprehensive Transportation Plan Update_September 25

DRAFT

INTERSECTION-LEVEL IMPROVEMENTS Recommendations for the future system include improvements to critical intersections and interchanges. These locations were identified due to operational deficiencies and safety concerns. More information about each improvement can be found in the Appendix. Additional details on intersection improvements will need to be determined through more in-depth safety and traffic analyses as the project progresses to design and construction. Table 3-4 includes the list of intersection-level improvements, while Figure 3-6 displays their locations. These recommendations are in addition to those already included as committed improvements. Although the grade separation at McCrimmon Parkway and NC 54 is shown in Figure 3-6, the project is currently committed. The project is shown for the purpose of reflecting a complete network but is not a recommendation deriving from this plan.

Table 3-4: Intersection-Level Improvements

CORRIDOR

IMPROVEMENT

Davis Drive & Morrisville Carpenter

Intersection Improvements

Davis Drive & Morrisville Parkway

Intersection Improvements

NC 54 & Morrisville Parkway

Intersection Improvements

NC 54 & NW Cary Parkway

Intersection Improvements

Aviation Parkway & Evans Road

Intersection Improvements

Morrisville Carpenter Road & Town Hall Drive

Intersection Improvements

Morrisville Carpenter Road Grade Separation

Grade Separation

Davis Drive & McCrimmon Pkwy

Intersection Improvements

Airport Boulevard & NC 54

Grade Separation

Crabtree Crossing Parkway at Morrisville Parkway

Intersection Improvements

Town Hall Drive & Carolina Street Extension

Roundabout

Slater Road & Carrington Mill Boulevard

Intersection Improvements

3-12 | P A G E

September 25, 2017 Draft

Made with FlippingBook HTML5