McAdams Graphics - Garment Installation Guide

Step 4: Locker Installation

ITU AbsorbTech will:

MATT #1

RYAN #2

GEORGE #3

„ „ If new lockers are being installed, confirm that all former lockers have been removed. If they haven’t been removed, ITU AbsorbTech installation team will uninstall and move to designated location. „ „ Transport, install, and anchor lockers in designated locations. „ „ Label lockers with each wearer name and identification number (complete information to be determined). „ „ Install hanger racks, repair stations and dispensers, soiled garment bins, and signs.

Garment Repairs

Deposit garments in need of repair HERE

Eric, Route Service & Sales Representative NEW BERLIN, WI

Sample Signs

Soiled Shirts

CUSTOMER RESPONSE CENTER 888-729-4884 REUSABLE & LAUNDERABLE n DO NOT THROW PRODUCT AWAY n WILL BE CLEANED FOR REUSE SIGNSP8 (10-14) ©2014 ITUAbsorbTech, Inc.

Deposit Soiled Shirts HERE

CUSTOMER RESPONSE CENTER 888-729-4884 REUSABLE & LAUNDERABLE n DO NOT THROW PRODUCT AWAY n WILL BE CLEANED FOR REUSE SIGNSP6 (03-14) ©2014 ITUAbsorbTech, Inc.

An authorized representative from your company will confirm the locker installation.

Made with