McAdams Graphics - Garment Installation Guide
Step 4: Locker Installation
ITU AbsorbTech will:
MATT #1
RYAN #2
GEORGE #3
If new lockers are being installed, confirm that all former lockers have been removed. If they haven’t been removed, ITU AbsorbTech installation team will uninstall and move to designated location. Transport, install, and anchor lockers in designated locations. Label lockers with each wearer name and identification number (complete information to be determined). Install hanger racks, repair stations and dispensers, soiled garment bins, and signs.
Garment Repairs
Deposit garments in need of repair HERE
Eric, Route Service & Sales Representative NEW BERLIN, WI
Sample Signs
Soiled Shirts
CUSTOMER RESPONSE CENTER 888-729-4884 REUSABLE & LAUNDERABLE n DO NOT THROW PRODUCT AWAY n WILL BE CLEANED FOR REUSE SIGNSP8 (10-14) ©2014 ITUAbsorbTech, Inc.
Deposit Soiled Shirts HERE
CUSTOMER RESPONSE CENTER 888-729-4884 REUSABLE & LAUNDERABLE n DO NOT THROW PRODUCT AWAY n WILL BE CLEANED FOR REUSE SIGNSP6 (03-14) ©2014 ITUAbsorbTech, Inc.
An authorized representative from your company will confirm the locker installation.
Made with FlippingBook