DRAFT Comprehensive Transportation Plan Update: July 23, 2018 version

PROJECT SHEETS

International Drive Extension

2010 – n/a New Location

Length 0.18 miles

Project Extents

From: Current Terminus To: Morrisville East Connector

Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – N/A Collector Street Congestion (v/c ratio) Planning Cost Estimate

2010 – N/A 2040 – N/A

$1,660,000 Crash Summary (June 2013 to May 2016) N/A

CROSS-SECTION

KEY STANDARD DIMENSIONS

ALTERNATIVE DIMENSIONS

NOTES:

14-ft lanes with sharrows

11-ft to 14-ft lanes

12-ft two way left turn lane

11-ft to 12-ft two way left turn lane

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.

5-ft minimum verge

0-ft to 10-ft verge

N/A

10-ft sidepath(s)

5-ft sidewalks

5-ft to 8-ft sidewalks

C-8 | P A G E D R A F T | 0 7 / 2 3 / 2 0 1 8