DRAFT Comprehensive Transportation Plan Update: July 23, 2018 version

PROJECT SHEETS

NC 54 (Chapel Hill Road)

2010 – n/a Widening

Length 0.62 miles

Project Extents

From: NW Cary Parkway To: Weston Parkway Traffic Volume (vpd) Street Hierarchy Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate 2010 – 22,412 2040 – 36,398

2010 – 0.96 2040 – 0.82

$7,822,000 Crash Summary (June 2013 to May 2016) Total Crashes – 28 EPDO Score – 193.2

CROSS-SECTION

KEY STANDARD DIMENSIONS

NOTES:

11-ft inside lanes

12-ft dedicated bus lanes

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.

17.5-ft planted median

0-ft to 10-ft verge 10-ft sidepath east side of roadway 5-ft sidewalk

C-14 | P A G E D R A F T | 0 7 / 2 3 / 2 0 1 8

Made with FlippingBook - Online Brochure Maker