Contract for Services

2260 Northwest Parkway • Suite H • Marietta, GA 30067 • 678-290-1325

Date of Issue:

1/10/19

Customer Information - 28668

Jobsite Information

Greg Mitchell 1760 Mercer Avenue College Park

Greg Mitchell 1760 Mercer Avenue College Park

Name:

Contact Name:

Address:

Address:

State: GA

Zip: 30337

State: GA

Zip: 30337

City:

City:

Phone:

Phone:

Cell: (404) 277-3835

Cell: (404) 277-3835

Fax:

Fax:

gregmitchell13@gmail.com; vickimitchell810@gmail.com

gregmitchell13@gmail.com; vickimitchell810@gmail.com

Email:

Email:

ENGINEERED SOLUTIONS OF GEORGIA PROPOSES TO FURNISH AND INSTALL THE FOLLOWING SCOPE OF WORK:

Waterproofing

Structural Repairs

Pressure Grouting

INTERIOR WATERPROOFING SYSTEM

1. Prep area and cover personal possessions with plastic. 2. Remove section of basement floor (slab) to expose footing and install drain. 3. Drill weep holes in block to drain water from wall and into system. 4. Install (120) linear feet of interior sub floor drain system to catch water below the floor level. 5. Install coraplast vapor barrier mechanically fastened and sealed to the foundation above the exterior grade level and sealed at the floor drain flange to catch any leakage through the wall above the floor level and channel any condensation to floor drain. 6. Install one sump system to include: 1/3 horse power sump pump, elevated sump platform, sealed sump lid, back flow valve, discharge line, high water alarm and battery back-up pump system. Existing electrical outlet to be used. If no outlet is available a dedicated outlet must be installed by others. 7. Install discharge line extending approximately (20’) from foundation to a pop up valve. 8. Install Catch Basin and sump pump at base of stair well with discharge approx. 20’ away from foundation 9. Install inspection ports in system. 10. Remove all work related debris and broom clean.

OTHERS TO PROVIDE THE FOLLOWING

1. Provide electrical outlet at pump location(s) if as required 2. Remove bath tub for foundation access

Applicable Warranty – see terms and conditions in the attached warranty addendum

Waterproofing Warranty

Structural Warranty

Triple Protection Warranty

Payment Schedule

$3,390.00

Deposit

Total Contract Amount

$13,560.00

$10,170.00

Due Upon Completion

Quotation valid for 90 days from the date of issue. Contract subject to terms and conditions printed on the accompanying addenda.

Presented by ESOG

Accepted by the Customer

ESOG Signature

Date

Customer Signature

Date

Print Name Chuck Irby

Greg Mitchell

Print Name

form revision 12/04/12