DRAFT Comprehensive Transportation Plan Update: 06/06/2018 version

PROJECT SHEETS

Morrisville-East Connector

2010 – n/a New Location

Length 0.58 miles

Project Extents

From: Current Terminus To: Watkins Road Traffic Volume (vpd) Street Hierarchy Collector Street Congestion (v/c ratio) Planning Cost Estimate

2010 – N/A 2040 – N/A 2010 – N/A 2040 – N/A

$ 5,121,352.50 Crash Summary (June 2013 to May 2016) N/A

CROSS-SECTION

KEY STANDARD DIMENSIONS

ALTERNATIVE DIMENSIONS 14-ft lanes with sharrows

NOTES:

12-ft lanes

12-ft two way left turn lane

11-ft to 12-ft two way left turn lane

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.

5-ft minimum verge

0-ft to 10-ft verge

N/A

10-ft sidepath(s)

5-ft sidewalks

5-ft to 8-ft sidewalks