2nd Floor Stairs Installed
2nd Floor Stairs Installed Install 3rd Floor Block Prep/Steel 3rd Floor Beam Pour 3rd Floor Beam Install/Build Wall Panels Install Party Wall Framing
Install 3rd Floor Block
Prep/Steel 3rd Floor Beam
Pour 3rd Floor Beam
Install/Build Wall Panels
Install Party Wall Framing
Install 3rd Floor Party Wall Framing
Install 3rd Floor Party Wall Framing
Install/Build 3rd Floor Wall Panels
2
Install/Build 3rd Floor Wall Panels
Block Rake Walls
Block Rake Walls Pour Rake Wall
Pour Rake Wall
Roof Trusses Installed
Roof Trusses Installed
Roof Sheathing
Roof Sheathing
Roof Sheathing/Eng. Inspection
Sheathing and Engineering Complete
First Layer Firewall Complete
First Layer Firewall Complete
Firewall Complete
Firewall Complete
House Wrap Complete
House Wrap Complete
Roof Dry-In
Roof Dry-In
Framing Complete
Framing Complete Hot Mop/Peel & stick Hot Mop/Peel & stick
Hot Mop/Peel & stick
Hot Mop/Peel & stick
Roof Installed
Roof Installed
Window Install
3
Window Install
HVAC Rough
HVAC Rough
Plumbing Rough
Plumbing Rough Electric Rough
Electric Rough
Management Frame Walk
Management Frame Walk
Framing Inspection
Framing Inspection
Pre-Drywall Orientation
Homeowner Pre-Drywall Walk-Thru
Brick/Stone Installed
Stone Installed Brick Installed Siding Complete
Brick/Stone Installed
Siding Complete
Stucco Plaster Complete
Stucco Plaster Complete Exterior Paint Complete Spray Foam Insulation
Exterior Paint Complete
Spray Foam Insulation
Insulation
Insulation
Drywall Installed
Drywall Hung/Installed Drywall Screw Inspection
Drywall Screw Inspection
Drywall Finish
4
Drywall Finish
Drywall Finish/Spray
Drywall Finish/Spray Interior Paint 1st Coat Install Garage Door
Interior Paint 1st Coat
Install Garage Door
Page 5 of 7
Kolter Homes Policies and Procedures
Policy No. 5.1.1, Spec Home Color Selection and Cutoff