ENISCA Subcontracted by Enisca Browne, PDE were commissioned to complete the detailed MEICA design of two new pumping stations for the UK’s largest water-only supplier, Affinity Water. The project comprised six booster pumps (ranging in size from 110Kw to 560 Kw) and all associated pipework.

DARD The purpose of this project was to provide an automation scheme for the motorised operation of all Rivers Agency vertical lift sluice gates operating on the Lower River Bann. The project comprised 13 sluice gates in 3 sets, across 3 individual locations. PDE were appointed Designer and Principal Contractor for the project. As built documentation, O&M manuals, Staff Training and On-going maintenance were also included in the project.

ENISCA BROWNE PDE were subcontracted by Enisca Browne to complete the detailed design for the construction and construction management of 2 UV Disinfection Plants for Affinity Water, the UK’s largest water-only supplier.

COMPANY PROFILE » PROJECTS • ENVIRONMENTAL

Made with FlippingBook - Online catalogs