FY 2018-19 and 2019-20 Adopted Operating and CIP Budget
CITY OF MORGAN HILL CAPITAL IMPROVEMENT PROGRAM
Project
Project No.
302n15
Trouble Spot Evaluation and Repair
Category
Wastewater
Department
Engineering & Utilities
Council Priorities Enhancing Public Safety, Maintaining Fiscal Responsibility
Location
Various Locations
Project Description This project is intended to identify and evaluate trouble spots within the sewer system service area. Trouble spots, resulting from various causes (settlement, debris and grease accumulation, pipeline deterioration due to age), can reduce the capacity of the existing system and must be repaired to mitigate the deficiency and prevent potential pipeline failure. Project Justification Trouble spots cause a decrease of the capacity of the sewer system and can lead to deficiencies in conveying flows downstream. In order to continue to provide adequate levels of service, it is important to ensure that the capacity of the existing sewer mains is not decreased by debris or other causes.
Strategic Planning Documents 2017 Sewer System Master Plan
2019-2024 Six-Year Capital Improvement Program