ENTSOG TYNDP 2017 - Main Report
LESS-ADVANCED NON-FID PROJECTS
ADVANCED NON-FID PROJECTS
2nd PCI LIST NON-FID PROJECTS
ADVANCED NON-FID PROJECTS
Minimum development of infrastructure common to all levels
FID PROJECTS
FID PROJECTS
FID PROJECTS
FID PROJECTS
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
ADVANCED
2nd PCI LIST
HIGH
LOW
Assessment as a whole of the projects belonging to each Infrastructure Level
Assessment of the Infrastructure needs
Figure 4.1: Infrastructure Levels
Based on the experience of TYNDP 2015 and 2 nd PCI selection process, ENTSOG identified that the High Infrastructure level, due to the elevated number of compet- ing initiatives included, had limited added-value, for both the TYNDP Energy System Wide assessment and the Project-Specific cost-benefit analysis of projects. How ever, the infrastructure level is maintained in line with the CBA methodology in force. Yet, following ACER Opinion on TYNDP 2015 on better and more realistic handling of projects, the Assessment Chapter covers the comprehensive evaluation of the Low, Advanced and 2 nd PCI list Infrastructure Levels. Results of the assessment of the High Infrastructure Level are made available in Annex E. In line with the TEN-E Regulation and the CBA methodology the TYNDP provides a common basis for the Project-Specific CBA of each PCI candidate (see Annex F). This involves the assessment of different infrastructure levels of the gas infrastruc- ture based on the level of maturity and PCI status of the projects. The TYNDP will be used by the Regional Groups as a background when considering the Project Specif- ic CBAs of the candidate projects for the 3 rd PCI List.
Ten-Year Network Development Plan 2017 Main Report | 145
Made with FlippingBook