ENTSOG TYNDP 2017 - Main Report
TYNDP 2015 FID projects
TYNDP 2017 FID projects
6
Completed Cancelled or not-resubmitted
New projects Re-confirmed from TYNDP 2015 Took the FID in the last years
18
Total: 46
Total: 34
19
18
Re-confirmed
10
9
Figure 4.5: Comparison of project with FID status in TYNDP 2017 and TYNDP 2015
6 12 8
22
BREAKDOWN OF PROJECTS IN TYNDP 2017 BY FID STATUS AND PCI STATUS
PCI – LNG Non-PCI – LNG PCI – Transmission Non-PCI – Transmission PCI – UGS Non-PCI – UGS
PCI
Non-PCI
Total: 234
99
FID
10
24
87
NON-FID
91
109
TOTAL
101
133
Table 4.2: Breakdown of projects in TYNDP 2017 by FID status and PCI status
Figure 4.6: Breakdown of the projects in TYNDP 2017 per 2 nd PCI List and per type of infrastructure
The share of projects with FID status has slightly decreased with respect to the TYNDP 2015. Among the submitted projects 10 projects with FID status and 91 projects with non- FID status are part of the 2 nd PCI List. As previously covered in this chapter, there are three defined project status (FID, Advanced Non-FID and Less Advanced Non-FID). Figure 4.7 shows the breakdown of the projects by status and type of infrastructure.
160
140
100
34
80
60
FID Advanced Non-FID Less-Advanced Non-FID
Total: 234
40
52
148
20
0
Advanced Non-FID Less-Advanced Non-FID
FID
LNG
TRA
UGS
Figure 4.7: Breakdown of projects in TYNDP 2017 by infrastructure type and project status
150 |
Ten-Year Network Development Plan 2017 Main Report