ENTSOG TYNDP 2017 - Main Report

TYNDP 2015 FID projects

TYNDP 2017 FID projects

6

Completed Cancelled or not-resubmitted

New projects Re-confirmed from TYNDP 2015 Took the FID in the last years

18

Total: 46

Total: 34

19

18

Re-confirmed

10

9

Figure 4.5: Comparison of project with FID status in TYNDP 2017 and TYNDP 2015

6 12 8

22

BREAKDOWN OF PROJECTS IN TYNDP 2017 BY FID STATUS AND PCI STATUS

PCI – LNG Non-PCI – LNG PCI – Transmission Non-PCI – Transmission PCI – UGS Non-PCI – UGS

PCI

Non-PCI

Total: 234

99

FID

10

24

87

NON-FID

91

109

TOTAL

101

133

Table 4.2: Breakdown of projects in TYNDP 2017 by FID status and PCI status

Figure 4.6: Breakdown of the projects in TYNDP 2017 per 2 nd PCI List and per type of infrastructure

The share of projects with FID status has slightly decreased with respect to the TYNDP 2015. Among the submitted projects 10 projects with FID status and 91 projects with non- FID status are part of the 2 nd PCI List. As previously covered in this chapter, there are three defined project status (FID, Advanced Non-FID and Less Advanced Non-FID). Figure 4.7 shows the breakdown of the projects by status and type of infrastructure.

160

140

100

34

80

60

FID Advanced Non-FID Less-Advanced Non-FID

Total: 234

40

52

148

20

0

Advanced Non-FID Less-Advanced Non-FID

FID

LNG

TRA

UGS

Figure 4.7: Breakdown of projects in TYNDP 2017 by infrastructure type and project status

150 |

Ten-Year Network Development Plan 2017 Main Report

Made with