ENTSOG TYNDP 2017 - Main Report
4.5.8 LIST OF PROJECTS 1)
FID PROJECTS
Commission- ing Year
PCI 2 nd List
Type
Code
Name
Country
Promoter
Compressor station 1 at the Croatian gas transmission system
Pipeline including CS TRA-F-334
Croatia
Plinacro Ltd
Yes
2017
Pipeline including CS TRA-F-241 MONACO section phase I (Burghausen-Finsing)
Germany
bayernets GmbH
No
2017
Pipeline including CS TRA-F-291 NOWAL - Nord West Anbindungsleitung
Germany
GASCADE Gastransport GmbH
No
2017
NEL Gastransport, Fluxys Deutschland, Gasunie Deutschland
Pipeline including CS TRA-F-768 Extension Receiving Terminal Greifswald
Germany
No
2017
LNG-F-147 Revythoussa (2 nd upgrade)
Greece
DESFA S.A.
No
2017
LNG Terminal
Pipeline including CS TRA-F-137 Interconnection Bulgaria – Serbia
Bulgaria Ministry of Energy
Yes
2018
Pipeline including CS TRA-F-378 Interconnector Greece-Bulgaria (IGB Project)
Bulgaria ICGB a.d.
Yes
2018
Pipeline including CS TRA-F-43 Val de Saône project
France
GRTgaz
Yes
2018
Pipeline including CS TRA-F-45 Reverse capacity from CH to FR at Oltingue
France
GRTgaz
No
2018
Pipeline including CS TRA-F-331 Gascogne Midi
France
TIGF - GRTgaz
Yes
2018
Pipeline including CS TRA-F-208 Reverse Flow TENP Germany
Germany
Fluxys TENP GmbH & Open Grid Europe GmbH Yes
2018
Pipeline including CS TRA-F-337 CS Rothenstadt
Germany
GRTgaz Deutschland GmbH
No
2018
Pipeline including CS TRA-F-343 Pipeline project “Schwandorf-Finsing”
Germany
Open Grid Europe GmbH
No
2018
Pipeline including CS TRA-F-344 Compressor station “Herbstein”
Germany
Open Grid Europe GmbH
No
2018
Pipeline including CS TRA-F-345 Compressor station “Werne”
Germany
Open Grid Europe GmbH
No
2018
Pipeline including CS TRA-F-753 West to East operation of the IP Waidhaus
Germany
GRTgaz Deutschland GmbH
No
2018
Support to the North West market and bidirectional cross-border flows
Pipeline including CS TRA-F-214
Italy
Snam Rete Gas S.p.A.
Yes
2018
Pipeline including CS TRA-F-230 Reverse Flow Transitgas Switzerland
Switzerland FluxSwiss
No
2018
SOCAR (The State Oil Company of the Azerbaijan Republic)
Pipeline including CS TRA-F-221 TANAP – Trans Anatolian Natural Gas Pipeline Project
Turkey
Yes
2018
LNG-F-229 Zeebrugge LNG Terminal – 5 th Tank & 2 nd Jetty
Belgium Fluxys LNG
No
2019
LNG Terminal
Interconnection Croatia/Slovenia (Lučko – Zabok – Rogatec)
Pipeline including CS TRA-F-86
Croatia
Plinacro Ltd
Yes
2019
Pipeline including CS TRA-F-937 Nord Stream 2
Germany
Nord Stream 2 AG
No
2019
Pipeline including CS TRA-F-051 Trans Adriatic Pipeline
Greece
Trans Adriatic Pipeline AG
Yes
2019
Storage Facility
UGS-F-1045 Bordolano Second phase
Italy
STOGIT S.p.A.
No
2019
LNG Terminal
LNG-F-183 Tenerife LNG Terminal
Spain
Gascan
No
2020
LNG Terminal
LNG-F-163 Gran Canaria LNG Terminal
Spain
Gascan
No
2021
Min. of Energy and Industry of AL & Min. of Economic Development of KO
Pipeline including CS TRA-F-1028 Albania - Kosovo Gas Pipeline
Albania
No
2022
Storage Facility
UGS-F-260 System Enhancements – Stogit – on-shore gas fields
Italy
STOGIT
No
2026
Pipeline including CS TRA-F-017 System Enhancements – Eustream
Slovakia
eustream, a.s.
No
2026
LNG Terminal
LNG-F-178 Musel LNG terminal
Spain
Enagás Transporte, S.A.U.
No
2026
United Kingdom
Pipeline including CS TRA-F-025 Industrial Emissions Directive (IPPC) – FID
National Grid Gas plc
No
Unknown
1) The 3 following projects were already commissioned by end 2016, and are therefore not reported in the table: Bordolano First Phase (UGS-F-259), Romania –Bulgaria Interconnection (TRA-F-029) and Exit Capacity Budince (TRA-F-1047).
Ten-Year Network Development Plan 2017 Main Report | 157