ENTSOG TYNDP 2017 - Main Report

ADVANCED NON-FID

Commission- ing Year

PCI 2 nd List

Type

Code

Name

Country

Promoter

Pipeline including CS TRA-N-814 Upgrade IP Deutschneudorf and Lasow

Germany

ONTRAS Gastransport GmbH

No

2016

Storage Facility

UGS-N-235 Nuovi Sviluppi Edison Stoccaggio

Italy

Edison Stoccaggio S.p.A.

No

2017

LNG Hrvatska d.o.o. za poslovanje ukapljenim prirodnim plinom

LNG Terminal

LNG-N-082 LNG terminal Krk

Croatia

Yes

2018

Pipeline including CS TRA-N-90 LNG evacuation pipeline Omišalj – Zlobin (Croatia)

Croatia

Plinacro Ltd

No

2018

Pipeline including CS TRA-N-429 Adaptation L-gas – H-gas

France

GRTgaz, GRDF and Storengy

No

2018

LNG terminal in northern Greece/Alexandroupolis – LNG Section LNG terminal in northern Greece/Alexandroupolis – Pipeline Section

LNG Terminal

LNG-N-062

Greece

Gastrade S.A.

Yes

2018

Greece

Gastrade S.A.

Yes

2018

Pipeline including CS TRA-N-063

Pipeline including CS TRA-N-357 NTS developments in North-East Romania

Romania SNTGN Transgaz SA

No

2018

Austria

GAS CONNECT AUSTRIA GmbH

Yes

2019

Pipeline including CS TRA-N-361 GCA 2015/08: Entry/Exit Murfeld

Interconnection Croatia – Bosnia and Herzegovina (Slobodnica – Bosanski Brod)

Pipeline including CS TRA-N-066

Croatia

Plinacro Ltd

No

2019

Czech Rep.

NET4GAS, s.r.o.

Yes

2019

Pipeline including CS TRA-N-136 Poland–Czech Republic Interconnection (CZ)

Czech Rep.

NET4GAS, s.r.o.

No

2019

Pipeline including CS TRA-N-752 Capacity4Gas (C4G) – DE/CZ

Czech Rep.

NET4GAS, s.r.o.

No

2019

Pipeline including CS TRA-N-918 Capacity4Gas (C4G) – CZ/SK

Pipeline including CS TRA-N-895 Balticconnector

Estonia

Elering AS

Yes

2019

Pipeline including CS TRA-N-915 Enhancement of Estonia-Latvia interconnection

Estonia

Elering AS

Yes

2019

Pipeline including CS TRA-N-928 Balticconnector Finnish part

Finland

Baltic Connector Oy

Yes

2019

EUGAL -– Europäische Gasanbindungsleitung (European Gaslink)

Pipeline including CS TRA-N-763

Germany

GASCADE Gastransport GmbH

No

2019

Pipeline including CS TRA-N-012 GALSI Pipeline Project

Italy

Galsi S.p.A.

Yes

2019

Storage Facility

UGS-N-237 Palazzo Moroni

Italy

Edison Stoccaggio S.p.A

No

2019

Storage Facility

UGS-N-374 Enhancement of Incukalns UGS

Latvia

JSC “Latvijas Gaze”

Yes

2019

LNG Terminal

LNG-N-912 Skulte LNG

Latvia

AS Skulte LNG Terminal

No

2019

Gas Interconnection Poland-Lithuania (GIPL) (Lithuania’s section) Gas Interconnection Poland-Lithuania (GIPL) (PL section)

Lithuania AB Amber Grid

Yes

2019

Pipeline including CS TRA-N-341

Pipeline including CS TRA-N-212

Poland

GAZ-SYSTEM S.A.

Yes

2019

Poland

GAZ-SYSTEM S.A.

Yes

2019

Pipeline including CS TRA-N-247 North–South Gas Corridor in Western Poland

Poland

GAZ-SYSTEM S.A.

Yes

2019

Pipeline including CS TRA-N-273 Poland–Czech Republic interconnection (PL section)

Poland

GAZ-SYSTEM S.A.

Yes

2019

Pipeline including CS TRA-N-275 Poland–Slovakia interconnection (PL section)

Storage Facility

UGS-N-233 Depomures

Romania Engie Romania SA

Yes

2019

Slovakia

eustream, a.s.

Yes

2019

Pipeline including CS TRA-N-190 Poland–Slovakia interconnection

Pipeline including CS TRA-N-902 Capacity increase at IP Lanžhot entry

Slovakia

eustream, a.s.

No

2019

Bidirectional Austrian–Czech Interconnector (BACI, formerly LBL project)

Pipeline including CS TRA-N-021

Austria

GAS CONNECT AUSTRIA GmbH

Yes

2020

Pipeline including CS TRA-N-423 GCA Mosonmagyaróvár

Austria

GAS CONNECT AUSTRIA GmbH

Yes

2020

Austria

GAS CONNECT AUSTRIA GmbH

No

2020

Pipeline including CS TRA-N-801 Břeclav–Baumgarten Interconnection (BBI) AT

Belgium Fluxys Belgium

No

2020

Pipeline including CS TRA-N-500 L/H Conversion

LNG evacuation pipeline Zlobin–Bosiljevo–Sisak–Kozarac

Pipeline including CS TRA-N-075

Croatia

Plinacro Ltd

Yes

2020

Pipeline including CS TRA-N-133 Bidirectional Austrian Czech Interconnection (BACI)

Czech Rep.

NET4GAS, s.r.o.

Yes

2020

Czech Rep.

NET4GAS, s.r.o.

No

2020

Pipeline including CS TRA-N-919 Capacity4Gas (C4G)–CZ/AT

LNG Terminal

LNG-N-079 Paldiski LNG Terminal

Estonia

Balti Gaas plc

Yes

2020

158 |

Ten-Year Network Development Plan 2017 Main Report

Made with