ENTSOG TYNDP 2017 - Main Report
FID PROJECTS WITHOUT A DIRECT CAPACITY IMPACT IN THE LOW INFRASTRUCTURE LEVEL – FID projects requiring an additional advanced or less-advanced project to produce a capacity impact – Internal FID projects enabling cross-border capacity development – FID projects not connected to the European mainland gas infrastructure
Commissioning Year
Code
Name
Country
LNG-F-229 Zeebrugge LNG Terminal – 5 th Tank & 2 nd Jetty
Belgium 2019
Interconnection Croatia/Slovenia (Lučko – Zabok – Rogatec)
TRA-F-86
Croatia
2019
TRA-F-937 Nord Stream 2
Germany
2019
TRA-F-1028 Albania – Kosovo Gas Pipeline
Albania
2022
TRA-F-334 Compressor station 1 at the Croatian gas transmission system
Croatia
2017
TRA-F-337 CS Rothenstadt
Germany
2018
TRA-F-343 Pipeline project “Schwandorf-Finsing”
Germany
2018
TRA-F-344 Compressor station “Herbstein”
Germany
2018
TRA-F-345 Compressor station “Werne”
Germany
2018
TRA-F-753 West to East operation of the IP Waidhaus
Germany
2018
LNG-F-183 Tenerife LNG Terminal
Spain
2020
LNG-F-163 Gran Canaria LNG Terminal
Spain
2021
TRA-F-017 System Enhancements – Eustream
Slovakia
2026
United Kingdom
TRA-F-025 Industrial Emissions Directive (IPPC)–FID
Unknown
Table 6.2: FID projects without a direct capacity impact in the low infrastructure level 1) 2)
The projects are considered in the low infrastructure level assessment starting from the year after their expected commissioning date. The relevant capacities for this infrastructure level can be found in the Annex D 1) . As a result of this assessment, the investment gaps, notably with respect to cross-border capacities, have been identified and are presented in the following sub-chapters. The assessment results are shown based on a representative selection of the investigated cases. This means where there is little to no difference between investigated cases, not all are displayed in order to improve the user-friendly experience. All other results are published in Annex E.
1) Sheets LNG, Storage and Transmission, “Low” in column I