ENTSOG TYNDP 2017 - Main Report
Supply Figure F.1 compares the supply potentials developed in 2014 for TYNDP 2015 with the actual EU imports. For Russia, Norway, Algeria and Libya those imports have materialised in the range of the potentials as expected in TYNDP 2015. LNG has shown actual imports below expected potentials. National production expectations were part of the data collection completed mid- 2014. The observed levels have varied from the estimated plans. The production cap imposed on the Groningen field in the Netherlands is the main driver for such difference. The Dutch Ministry of Economic Affairs originally announced in January 2014 a production cap of 42.5 bcm for 2015. This cap was revised down on a num- ber of occasions between December 2014 and until mid-2015, and was finally set to 30bcm. Actual production in 2015 were reported as 28.1bcm 1) . As part of the TYNDP 2017 process, the supply potentials have been amended. In particular, ENTSOG has developed a new approach to the LNG maximum supply potential, making use of information from the IEA World Energy Outlook. This has led to a downward revision of the maximum potential. During the stakeholder engagement process for TYNDP 2017, the new supply potentials were presented and discussed, resulting in further adjustment of some of the sources. The stake- holder input also resulted in the introduction of a “tomorrow as today” approach for the first year of the assessment, 2017, calculated based on the maximum and min- imum levels observed for every source in the recent years, in line with the approach retained in the Supply Outlooks & Reviews.
TYNDP
2,000 TWh/y
bcm
2015
2017
180
1,800
160
1,600
140
1,400
120
1,200
100
1,000
80
800
60
600
40
400
20
200
0
0
2009
2010
2011
2012
2013
2014
2015
Tomorrow as today
NP
LNG
DZ
LY
NO
RU
Figure F.1: Actual EU Gas Supply 2009–2015, TYNDP Supply Potentials data
1) Dutch Ministry of Economic Affairs/TNO, Geological Survey of the Netherlands. http://www.nlog.nl/en/groningen-gasfield-0
24 |
Ten-Year Network Development Plan 2017 Main Report