Project 2013 Advanced

Project 2013

Lesson 3 - Evaluating and Distributing Data

7. Select the desired options on the Margins page. 8. Select the Header tab. 9. Select the desired options on the Header page. 10. Select the Footer tab. 11. Select the desired options on the Footer page. . 13. Select the Project tab. 14. Select Close , as necessary, to close all open dialog boxes. 12. Select

Step-by-Step

Change page setup options.

Create the Cost Overruns report that appears in the Cost category. Go to the Print Preview mode.

Steps

Practice Data

1. Select Page Setup from the Print Preview window. The Page Setup dialog box opens.

Click

.

2. Select the Page tab.

Click

, if necessary.

The Page page appears.

3. Select the Portrait or Landscape option under Orientation . The desired orientation option is selected.

Click

, if

necessary.

4. Select the Footer tab.

Click

.

The Footer page appears.

5. Select the desired alignment tab.

Click

.

The desired alignment page appears.

6. Select the General or Project fields list at the bottom of the Footer page. A list of footer options appears.

Click General

.

Scroll as necessary and click Project Current Date.

7. Select the desired option.

The desired option is selected.

OFFICEPRO, Inc.

Page 71

Made with FlippingBook - Online catalogs