Microsoft PowerPoint - CAPM Exam Prep Part 1.pptx

CAPM ® Exam Prep Part 1

Management Plans (Pages 97 -98)

• Management plans describe how the project manager will define, plan, manage, and control • There are management plans for each knowledge area plus: – Change management plan – Configuration management plan – Requirements management plan • Mentioned over 200 times in the PMBOK ® Guide

88

-Continued

Management Plans ( Continued, Pages 97-98)

For the exam, you must assume that management plans exist Example: • If a question asks about a problem on a project, the answer might be for the PM to look at the project management plan to see how it is to be handled • In executing, when the work is being done, the PM might refer to the cost management plan to see how costs are to be measured

89

Inputs: Develop Project Management Plan ( PMBOK ® Guide , Pages 83-84)

Inputs

• Project charter • Outputs from other processes

• EEFs • OPAs

90