Maxxfast-EN

VINYMAXX installation data in solid & hollow substrates

Solid substrates

Hollow substrates*

Type

M8 x 110 M10 x 130 M12 x 160 M12 x 220 M8

M10

M12

D

M8

M10 130

M12 160

M12 220

M8

M10

M12

L

110

-

-

-

Torque in Nm

10 10

12 20 11

14 30 13

14 30 13

10 16

20 16 11

30 22 13

Hole diameter in substrate (d o Hole diameter in fi xture (d f Minimum substrate thickness (h min. ) in mm ) in mm

9

9

) in mm

120

130

160 115

160 115

120/250 90/130

120/250 90/130

120

Minimum hole depth (h o

) in mm

85 20 80 80 40 40

95

90

Maximum fi xture thickness (tfi x max.) in mm

2

34

94

-

-

-

Effective embedment depth (h ef Characteristic spacing (S cr ) in mm

) in mm

90

110 220 110

110 220 110

85/125

85/125

85

160

180

- -

- -

- -

Characteristic Edge distance (tensile) (C cr

,N) in mm

90 45 45

Minimum spacing (S min.

) in mm

55 55 20

55 55 20

100 200

100 200

100 200

Minimum edge distance (tensile) (C min,N. Characteristic load in solid brick in kN (N Rk,S ) Design resistance in solid brick in kN (N Rds ) *Plastic sleeves must be used

) in mm

8,7 2,9

12,1

- -

- -

- -

4

6,7

6,7

VINYMAXX working & curing times in solid & hollow substrates

Resin

Concrete

Working time

Minimum curing time*

Temperature ÂșC

Minutes

5 5 5

-5

70 45 25 15

480 240 120

0 5

10 15 20 25

10 15 20 30

90 60 45

9 5 2

30 *For wet concrete, the curing time must be doubled.

Made with