The UK Offshore Oil and Gas Fabricators Directory 2014
Capabilities and Capacities – Facility 1, Rosyth Other e.g. Licences, Permissions, Warehouse and Storage Size,
(continued)
• Babcock are currently upgrading the site – £100 million spent in the last four years • 2,100 metres of tidal and non-tidal berthing • Sheltered non-tidal basin measuring 512 metres x 457 metres • Coating workshop of 1,440 m 2 • Storage – 35,000 m 2 (mixed covered and uncovered) • Electrical connection up to 11 kilovolts at 50 or 60 Hertz • Unrestricted, direct access to sea • Waterway shipyard – open sea 10.5 metres (basin depth) x 42 metres (direct entrance width) x 45.7 metres (forth bridges navigable headway). However, only one of these limitations apply at any one time
Engineering, Electrical and Joiners Workshop Size, etc.
Capabilities and Capacities – Facility 2, Appledore Total Area (m²) 81,000 m 2 Fabrication Area Covered (m²) 16,640 m 2 Assembly and Erection Area (m²) 8,036 m 2 Cranage – Lifting Capacity and Hook Height (Tonnes and Metres)
• Main hall – overhead 2 x 60 tonnes • Unit assembly area – Semi-Goliath 4 x 10 tonnes • 28 overhead travelling Gantry Cranes (maximum lift of 60 tonnes safe work load)
Load-Out Capacity (Tonnes)
750 tonnes
Minimum Water Depth (Metres) Maximum Water Depth (Metres)
Not provided
4.6 metres (building dock sill)
Dry-Dock Capability
Dock – 118 metres x 33.54 metres, (16.4 tonnes/m 2 uniformly distributed load)
>
page 26
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2014