The UK Offshore Oil and Gas Fabricators Directory 2014
Capabilities and Capacities – Facility 2, Ship Repair Total Area (m²) 81,000 m 2
Fabrication Area Covered (m²)
1,200 m 2
Assembly and Erection Area (m²)
25,000 m 2
Cranage – Lifting Capacity and Hook Height (Tonnes and Metres)
Workshop • 25 tonne Gantry Crane
Dry Dock • 1 x 80 tonne at 38 metre Tower Crane • 1 x 40 tonne at 25 metre Tower Crane • 1 x 40 tonne at 25 metre Tower Crane
Quayside • 1 x 40 tonne at 30 metre Tower Crane
Load-Out Capacity (Tonnes)
• Up to 30,000 tonnes via skidding on quayside • Multi-wheel transporters capable of handling up to 780 tonnes. Additional transporters hired as necessary
Minimum Water Depth (Metres) Maximum Water Depth (Metres)
8.6 metres
12.1 metres
Dry-Dock Capability
• 335 metres x 50 metres x 14.75 metres (Belfast Dock) • 333 tonnes/metre or 10.94 tonnes/m 2 load capacity
>