The UK Offshore Oil and Gas Fabricators Directory 2014

Projects and Markets

(continued)

Design and build two high voltage and AC substations

Client: Siemens Transmission and Distribution Ltd Period: Quarter 1 2010 to Quarter 2 2012

Siemens awarded Harland and Wolff the design and build contract for two offshore substation platforms for the Gwynty Môr offshore wind farm, which is situated 13 kilometres off the coast of North Wales. The Gwynt y Môr offshore wind farm is a 576 megawatt, 160 turbine UK Round 2 wind farm being developed by a consortium of RWE Innogy, SWM – Municipal Utility Munich, Germany, and Siemens. The wind turbines will be connected via 33 kilovolt array cables to two new offshore substations, also the responsibility of Siemens.

Blackford Dolphin Accommodation and Power Generation Modules

Client: Blackford Dolphin Pte Ltd Period: Quarter 1 to Quarter 3 2006 (Blackford Dolphin Accommodation) and Quarter 1 to Quarter 4 2006 (Blackford Power Generation Modules) Harland and Wolff tendered and won the contract for both the accommodation and power generation modules. Starting with a basic specification and a footprint of the unit, Harland and Wolff was responsible for the design, approval, procurement, manufacture, assembly, outfitting and mechanical completion. The work was carried out in the controlled environment of the company’s manufacturing halls, prior to being lifted onto the delivery barge using Goliath Gantry Cranes.

>

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2014

page 55

Made with FlippingBook - professional solution for displaying marketing and sales documents online