ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects

Print

LNG terminal in Świnoujście - GAZ-SYSTEM S.A.

138

LNG-F-246

LNG terminal in Świnoujście

FID

LNG Terminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

TEN-E Project ?

Priority Project

Interested by PCI ?

No

IGAs

None

Web Link

en.gaz-system.pl/terminal-lng/

Undefined (100,00%)

Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

Regasification facility

Regulated

LNG terminal in Świnoujście

Considered Tariff Regime

FID

Expected volume (bcm/y)

Regulated

2010

+5.00

Applied for Exemption ?

Construction

Storage capacity (m3)

No

+320,000.00

Exemption granted ?

Commissioning

Send-out (mcm/d)

Not relevant

2014

+13.68

% Exemption in entry direction

Last completed Phase :

Ship size (m3)

0%

FID

216,000.00

% Exemption in exit direction

Reloading ability ?

0%

No

PROJECTED CAPACITY INCREASES

Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 10

Made with