ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects
Physical reverse flow on the metering station in Mallnow - GAZ-
207
TRA-F-326
Physical reverse flow on the metering station in Mallnow*
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
GAZ-SYSTEM S.A.
Operator
GAZ-SYSTEM S.A. (ISO)
TEN-E Project ?
Not part of TEN-E
Interested by PCI ?
No
IGAs
None
Web Link
Undefined (100,00%)
Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
Total Compressor Power (MW)
Applied for Exemption ?
Construction
No
2013
Exemption granted ?
Commissioning
Expected Load Factor
Not relevant
2013
% Exemption in entry direction
Last completed Phase :
0%
Construction
% Exemption in exit direction
0%
Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 3