ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects

Print

Physical reverse flow on the metering station in Mallnow - GAZ-

207

TRA-F-326

Physical reverse flow on the metering station in Mallnow*

FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A. (ISO)

TEN-E Project ?

Not part of TEN-E

Interested by PCI ?

No

IGAs

None

Web Link

Undefined (100,00%)

Gas Transmission OperatorGAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

Total Compressor Power (MW)

Applied for Exemption ?

Construction

No

2013

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2013

% Exemption in entry direction

Last completed Phase :

0%

Construction

% Exemption in exit direction

0%